CCI uncovered 195 acres of land business park close to Austin air terminal

CCI

A build-to-suit advancement has been revealed close to the Austin air terminal that tries to take advantage of interest for business space in Southeast Austin now that Tesla Inc. is building a $1.1 billion plant in the area.

Capital Commercial Investments Inc. (CCII) declared Oct. 8 designs for Bergstrom Technology Park: different structures spread across 195-acre of land, intended for “organizations searching for financially savvy and brisk inhabitances.”

Bergstrom Technology Park incorporates one structure previously finished in addition to four more on the planning phase generally west of Austin-Bergstrom International Airport, and CCI has a close-by 150-acre of land bundle experiencing the qualification cycle. The land is around 10 minutes south of the Tesla processing plant.

The main structure in the improvement was really finished and conveyed to the city of Austin in March 2019. CCI changed over an about 558,000-square-foot previous Lockheed Martin office into office space and the Austin Municipal Courthouse.

Presently Austin-based CCI is uncovering its more extensive vision for the undertaking. Bergstrom Technology Park will include various Bergstrom Tech Centers, turnkey structures with a design involved 85% open workplaces and 15% private workplaces.

The advancement focuses on an “Austin tech-stylish tasteful,” as indicated by the declaration. Andrew Lodeesen, CCI VP of improvement, in an announcement brought to mind “overhead entryways that open to outside spaces loaded up with bocce courts and outside ping pong tables.”

As indicated by a showcasing leaflet, the land is drafted for light modern and is situated inside an open door zone, which can give charge reserve funds to speculators utilizing capital increases to subsidize ventures. Conveniences are relied upon to incorporate a recreation center and gaming territory, a public circle green and climb and bicycle trails.

With privileges previously made sure about, CCI is promoting Bergstrom Tech Center as a quicker method to move into new workplaces. It said the city of Austin moved into BTC 1 only year and a half in the wake of marking a rent.

CCI said specially made plan determinations, including Covid-19 alleviation systems, will be organized in buildout.

CCI has more than $1 billion in resources under administration. It was established in 1992 and has done in Austin, Houston and Dallas, just as Phoenix, Atlanta and different districts across the country.

Compare listings

Compare
Pixel CTA
737-210-1690 Call Text